
Update – July 5, 2012: The drains were set, gravel placed around the perimeter and the main poles are in place and were being finished as the roof trusses were arriving on a flatbed.
Update – July 5, 2012: The drains were set, gravel placed around the perimeter and the main poles are in place and were being finished as the roof trusses were arriving on a flatbed.